• Home
  • News
  • Workplan
  • Partners
  • Documents
  1. Documents

Documents


In this section you can download documents produced during DESTination Rail project:

  • DESTination RAIL Newsletter Issue 1 (26.6.2015, PDF, 485 KB)

  • Railway Days Bucharest 6/7 October 2015 (20.10.2015, Power Point, 6.482 KB)

  • DestinationRail Newsletter Issue number 2 Final (22.12.2015, PDF, 1.18 MB)

  • DESTination RAIL Terminology (17.02.2016, PDF, 154KB)

  • Railway Pro Technology and Services Forum (03.03.2016, PDF, 1.42MB)

  • DestinationRail car (03.03.2016, PDF, 3.16MB)

  • International Bridge Symposium (03.05.2016, PDF, 1.19MB)

  • Bridges 2016 - Lorcan Connolly (03.05.2016, PDF, 2.14MB)

  • DESTination RAIL Newsletter Issue 3 (07.07.2016, PDF, 1.34MB)

  • DESTination RAIL Newsletter Issue 4 (27.02.2017, PDF, 1.1MB)

  • DESTination RAIL Newsletter Issue 5 (31.07.2017, PDF, 1.25MB)

  • DESTination RAIL Newsletter Issue 6  (05.02.2018, PDF, 1.29MB)

  • DESTination RAIL Newsletter no 7.pdf (08.06.2018, PDF, 1.11MB)

 

Deliverables

  • Deliverable D1.1 Report on Common Problems Faced by Rail Infrastructure Managers (03.5.2017, PDF, 1.37MB)

  • Deliverable D1.2 Guideline on Methods to Find Hot-Spots on Rail Networks (19.12.2017, PDF, 3.12MB)

  • Deliverable 1.3. Report on Monitoring Switches and Crossings.pdf
  • Deliverable 1.4 Report on the use of remote monitoring for slope stability assessments.pdf
  • Deliverable 1.5 Implementation of a complete vibration monitoring system on Irish Rail bridge.pdf
  • Deliverable D2.1 Guideline for Probability Based Multi Criteria Performance Optimisation of Railway Infrastructure (19.12.2017, PDF, 2.10MB)

  • Deliverable 2.2 Report on Assessment of Bridges.pdf
  • Deliverable 2.3 Report on Assessment of Earthworks.pdf
  • Deliverable 2.4 Report on Assessment of Track.pdf
  • Deliverable D3.1 Information Management System Framework (24.4.2017, PDF, 900KB)

  • Deliverable D3.2 Risk Assessment Methodology (24.4.2017, PDF, 2.89MB)

  • Deliverable D3.3 Report on Decision Support Tool (19.12.2017, PDF, 1.06MB)

  • Deliverable 3.4 Proof-of-concept on case study.pdf
  • Deliverable 3.5 Principles for estimating and communicating the risk of neglecting maintenance.pdf
  • Deliverable 3.6 Risk Assessment Methodology.pdf
  • Deliverable 3.7 A network flow model to determine optimal intervention programs for railway infrastructure networks.pdf
  • Deliverable 4.1 Guidelines on the use of novel construction and maintenance techniques within the operational railway environment.pdf
  • Deliverable 4.2 Report on Traffic Flow Model.pdf
  • Deliverable 4.3 Report on Whole Life Cycle Analysis Tool.pdf
  • Deliverable D5.1 Dissemination Strategy Plan (07.11.2016, PDF, 140KB)

  • Deliverable D5.2 Exploitation Plan (07.11.2016, PDF, 408KB)

  • Deliverable D5.3 Website Report (07.11.2016, PDF, 176KB)

  • Deliverable 5.7. Report on Pilot Projects.pdf
  • Deliverable 5.8 Report on Demonstration Projects.pdf
  • Deliverable D6.2 Report on kick-off meeting (24.4.2017, PDF, 6.18MB)

 

Access to private project AREA


Credentials

Please contact project coordinator to get username and password to access private area.

Access using web browser
To acess project private area you can use you web browser. Address to access files is: http://ftp.zag.si:5000


To use the full featured web access, you will need the newest web browser, Java and Flash Player.

  • Browser: Internet Explorer 8 or later, Firefox 3.6 or later, Safari 5.0 or later, Chrome; with JavaScript enabled
  • Java (for browsing folders on the local computer): Java Runtime Environment (JRE) 5 or onward
  • Flash: Flash Player 9.0.28 or onward

Access using FTP protocol

Configure yur favorite ftp client with server: ftp://ftp.zag.si

Copyright © http://www.destinationrail.eu | Designed by ZAG

 

EU_flag_yellow_high.jpg

This project has received funding from European Union's Horizon 2020 research and innovation programme under grant agreement No 636285.